The FVR framework is not a linear timeline; it is a state machine. You do not pass to the next phase because time has passed. You pass because a condition has been verified.

The Three Great Gates

Gate 1: The Silence Gate

Phase 0 (War)Phase 1 (Freeze)
Condition: 72 hours of < S2 violations confirmed by OSCE.

Gate 2: The Vacuum Gate

Phase 1 (Freeze)Phase 2 (Vote)
Condition: Withdrawal of heavy weapons + Return of 10% of IDPs.

Gate 3: The Integrity Gate

Phase 2 (Vote)Phase 3 (Rebuild)
Condition: Election certified 'Free & Fair' by International Commission.